Page 208 - compilation-containing-the-charter-and-revised-ordinances-of-the-city-of-lake-city-florida-(1912)-gillen-and-hodges
P. 208
Charter and Revised Ordinances of Lake City Florida (1912) Gillen & Hodges
Charter of the City of Lake City
205
shall be of widths as hereinbefore stated and the
material used therein shall be of cement concrete. 205/257
Sec. 2. That the estimated total cost of such
sidewalks and the estimated amount of front foot
age special assessments abutting property is as
follows: A total of 17,766 square yards at $1.00
per square yard, makes a total of $17,766.00; the
front footage special assessment two thirds of the
total cost, $11,777.32. That the estimated total
area of sidewalks in Olustee Park is 688 square
yards at $1.00 per square yard, making the total
cost thereof $688.00.
Sec. 3. That one third of the total cost of the
said sidewalks shall be borne by the City out of the
funds now in hand and to be raised hereafter, and
two thirds the assessed total cost shall be assessed
against the property fronting on the streets and
abutting the said sidewalks; such special assess
ments and cost of construction to be paid or se
cured, in the discretion of the board of public
works, in cash in whole or in part, or with special
assessment of City certificates, drawing interest
at seven per cent per annum payable in install
ments of four equal payments of six, twelve,
eighteen and twenty-four months, from the date
of the assessment; provided that any owner of
property fronting upon such streets, and abutting
upon such sidewalks against which any such spe
cial assessment is made, shall have the right to
pay any such assessment against his property with
in thirty days after the publication of a resolution
of the City Council, fixing any such special assess
ment per front foot, without the payment of
interest.
www.LakeCityHistory.com LCH-UUID: E8DD44AB-53A8-4AFA-B7BD-16C421D14A41